Your location:Home > Company Business > Toll Roads & Bridges

Toll Roads & Bridges

Close| Print

The toll highway projects, which were operated and invested in by the Group, located in Shenzhen City, other areas of Guangdong Province and other provinces in the PRC.

Projects operated and invested by the group:
Toll Highways Locations Length(km) interests hold No. of Lane(s) Status maturity Introduction of projects Toll rates
Meiguan Expressway Shenzhen 5.4 100% 6/8 Operation 2027.03 Detail> Detail>
Jihe East Shenzhen 23.7 100% 6 Operation 2027.03 Detail> Detail>
Jihe West Shenzhen 21.8 100% 6 Operation 2027.03 Detail> Detail>
Yanba Expressway Shenzhen 29.1 100% 6 Operation Section A:2026.04 / Section B:2028.07 / Section C:2035.03 Detail> Detail>
Shuiguan Expressway Shenzhen 20.0 50% 10 Operation 2025.12 Detail> Detail>
Shuiguan Extension Shenzhen 6.3 40% 6 Operation 2025.12 Detail> Detail>
Yanpai Expressway Shenzhen 15.6 100% 6 Operation 2027.03 Detail> Detail>
Nanguang Expressway Shenzhen 31.0 100% 6 Operation 2033.01 Detail> Detail>
Yangmao Expressway Guangdong 79.8 25% 4 Operation 2027.07 Detail> Detail>
Guangwu Project Guangdong 37.9 30% 4 Operation 2027.11 Detail> Detail>
Jiangzhong Project Guangdong 39.6 25% 4 Operation 2027.08 Detail> Detail>
GZ W2 Expressway Guangdong 40.2 25% 6 Operation 2030.12 Detail> Detail>
Qinglian Expressway Guangdong 216 76.37% 4 Operation 2034.07 Detail> Detail>
Wuhuang Expressway Hubei 70.3 55% 4 Operation 2022.09 Detail> Detail>
Changsha Ring Road Hunan 34.7 51% 4 Operation 2029.10 Detail> Detail>
Nanjing Third Bridge Jiangsu 15.6 25% 6 Operation 2030.10 Detail> Detail>

Note:

1.With the same number of lanes, the differences in design standards such as design speed and surface quality may cause differences in capacity. Generally, the capacity of a four-lane expressway is approximately 100,000 passenger car unit per day while the capacity of a six-lane expressway is approximately 120,000 passenger car unit per day.

2.Yanba Expressway was constructed by section A, section B and section C, and was opened to traffic for operation in 2001, 2003 and 2010 respectively. As approved by Guangdong Provincial Government, the operation period of Yanba Expressway is 25 years, which is calculated from the day of opening for traffic by each section separately.

3.Toll-free for Meilin to Guanlan section of Meiguan Expressway with a mileage of approximately 13.8 km was implemented from 24:00 on 31 March 2014 and the toll for section from Shenzhen-Dongguan border to Guanlan with a mileage of approximately 5.4 km remained.